High construction speed

Prefabricated in factories and assembled on-site in modules. With 2 workers collaborating, a 40㎡ house can be put into place in as fast as 10 hours. This turns the housing demand ofconstruction completed and usable on the same dayinto a reality, significantly shortening project cycles, accelerating capital recovery, and fulfilling social or commercial commitments more quickly.

0 Large Tools Required

Nearly all modules are within the lifting capacity of two people. There is no need to use heavy tools such as cranes or forklifts, and the assembly can be completed with a small number of power tools.Lightweight and durable materials enable zero-experience on-site assembly by hand, further reducing construction costs.

Cost-effective Transportation Solution

Standardized loading enables direct compatibility with standard sea freight container dimensions. Each 40 HC container can accommodate multiple sets of products, delivering a high loading efficiency and reducing transportation costs.

100 units per day delivery capacity

we has a stable production and delivery capacity of 100 buildings per day, enabling efficient response to large-scale housing demand in a short period. While ensuring rapid delivery, it strictly adheres to quality standards, perfectly meeting the dual requirements of speed and quality for government projects.